How long does the delivery time of Ndfeb magnet take?

How long does the delivery time of Ndfeb magnet take? This is a very specific problem, the delivery date and product performance requirements, specifications, quantity, surface treatment are related, we need to understand the NdFeb magnet production process and processing process, and then to analyze and discuss the delivery time needs how many days?

How long does the delivery time of Ndfeb magnet take?插图

Ndfeb magnet production process


The manufacturing process of NdFeb blank is a powder metallurgy process, and the blank production process mainly includes melting (stripping), powder making, molding, sintering, and magnetic property detection. The blank production cycle is only 5-7 days, but the blank manufacturer needs to arrange equipment and personnel according to its own production plan, generally from the order to the blank is about 10-18 days. The peak production season of some manufacturers may take 20-40 days. The detailed production process can be referred to here – how is the NdFEB permanent magnet manufactured?

How long does the delivery time of Ndfeb magnet take?插图1

Machining of NdFeb magnets


After we have the blank of the performance required by the customer, we only need to consider the time of machining and surface treatment. Processing mainly includes grinding, wire cutting, slicing, some also need to punch and countersink, and finally chamfering and electroplating (surface treatment), in general, the ordinary machining 5-7 days, chamfering and electroplating 2-3 days, generally speaking, the processing time is about 7-10 days. If you need to drill and countersink treatment, but also consider the time of custom tools and drills, and the efficiency of drilling countersink is not too high, the time is more specific.

For processors, they need to combine the current degree of production saturation to arrange orders, some products, need to go through several processors to complete, not only to consider the connection of various processes, but also to consider the overall delivery efficiency of equipment and personnel.

How long does the delivery time of Ndfeb magnet take?插图2

How long is the fastest delivery time of Ndfeb magnet?


Of course, if the cost is not considered, the general square pieces and tiles can also be delivered within 4-5 days in the case of blank. However, this is easy to disrupt the original production order, have an adverse impact on the normal production of orders, may also make mistakes in the busy, and finally more than worth the loss. Therefore, we generally reply the customer that the sample delivery time is 7-10 days, and the batch delivery time is 15 days when there is a blank. If a new blank needs to be made, it takes 10 more days to consider, that is, 25 days.

I hope the above information can help you! Have questions about NdFeb magnets, samarium cobalt magnets, welcome to contact us.